From 526895003442d1a8da657ab0f74682c3ba74ca0a Mon Sep 17 00:00:00 2001 From: Jean Machuca Date: Wed, 11 Nov 2026 02:18:23 +0000 Subject: [PATCH] docs: add mission script for completing open issues + coordinated release --- .../complete-open-issues-release.md | 61 +++++++++++++++++++ 1 file changed, 61 insertions(+) create mode 100644 mission-scripts/complete-open-issues-release.md diff --git a/mission-scripts/complete-open-issues-release.md b/mission-scripts/complete-open-issues-release.md new file mode 100644 index 0000000..314a55c --- /dev/null +++ b/mission-scripts/complete-open-issues-release.md @@ -0,0 +1,61 @@ +# Mission Script: Complete Open Issues + Coordinated Release + +## Mission Name +Close all open enhancement issues across CognitiveOS repos and deploy coordinated release + +## Frequency +Stealth / Precision + +## Outcome +All 13 open enhancement issues resolved across 13 repos: +- cli #12: TUI test coverage +- cognitive-os.org #16: CI link checking + HTML validation +- cognitiveos-alpine-distro #11: CI ISO/RPi build verification + binary size checks +- cognitiveos #11/#10: FUNDING.yml + LICENSE file +- cognitiveosd #12: Daemon test coverage +- core-mcp-bridges #18: Bridge binary tests +- cpm #18: CLI command + internal package tests +- inference #14: Request validation + rate limiting +- product-specs #11/#9: JSON Schema validation tests + CI schema/markdown linting +- registry-server #14: SQLite metadata index for production +- sdlc #12: CI markdown + YAML linting + +Plus M8 variant asset completion (dependency check), then coordinated release with new tag. + +## Constraints + +- All work MUST follow GHW: topic branch → PR → `development` → release PR → `main` +- No rebase MUST be used; plain `git pull` (merge) preferred +- All normative statements in spec updates MUST use RFC 2119 capitalized key words +- All Go code MUST pass `gofmt -s` and `go vet` +- All shell scripts MUST pass `sh -n` and `shellcheck` +- All changes MUST follow SPECv1 folder structure where specs are involved +- M8 variant pipelines (edge-armv7, edge-aarch64, gateway-x86_64, standard-x86_64, micro-armv7) MUST produce assets on `v1.1.0-alpha` OR a new coordinated tag MUST be created +- Titan variant MUST remain manual-only (existing policy) + +## Acceptance + +- [ ] All 13 open issues closed via merged PRs +- [ ] All PRs merged to `development`, then promoted to `main` +- [ ] M8 variant assets verified OR new coordinated tag created covering all fixes +- [ ] `sdlc/scripts/healthcheck.sh --tag --branch main` passes across all 16 repos +- [ ] `sdlc/scripts/release-tag.sh` used for coordinated tagging +- [ ] All AGENTS.md enforcement references intact + +## Verification + +Run the Pilot's Final Checklist: + +1. **Vibe Calibration** — Mission Script high-fidelity: poetic clarity + engineering precision. Frequency: Stealth/Precision. +2. **Garage Inspection** — MCP servers live. Privacy Shield active. HUD visible. +3. **Diamond Squad Roll Call** — 4 Specialists in position (Logic/Ops/Creative/Risk). Bridge is dead. +4. **Double Tenaza Grip** — Ready to Let Go (CI automated). Ready to Grip (telemetry triggers armed). +5. **Circuit Delta Target** — Baseline: 13 open issues across 13 repos. Target: 0 open issues. + +IRA Target: 95%+. Below 70% triggers Vibe rewrite and re-run. + +--- +**Authority:** Pilot (VibeLeading) +**Vocabulary:** SPECv1 (RFC 2119) +**Workflow:** GHW (topic branch → PR → merge → development → PR → merge → main) +**Synthesis:** ABSEv1 (AESE methodology via `WHAT` → `INIT`) \ No newline at end of file