Skip to content

Qualify KyYard upgrades with relay-isolated runner fixtures - #212

Merged
Yoshiofthewire merged 2 commits into
masterfrom
test/yard-primary-acceptance
Nov 18, 2026
Merged

Yoshiofthewire merged 2 commits into
masterfrom
test/yard-primary-acceptance

Conversation

@Yoshiofthewire

@Yoshiofthewire Yoshiofthewire commented Nov 18, 2026 •

Copy link
Copy Markdown
Member

Yard upgrade acceptance now rejects local runners whose embedded catalog could re-enable production push relays in a disposable Identity deployment.

  • Build fixture runners from a copied source tree with the existing relay overrides embedded.
  • Inspect the actual runner binary before workload startup, including cached image overrides.
  • Verify explicit empty relay settings in Identity's Deployment and pods across installation, handoff, runner upgrade, recreation and revoke.
  • Qualify the published0.6.0.3-to-0.6.1.1 primary Kubernetes upgrade with retained keys/session and native administrator/everyday access checks; record the historical fixture gap.

Review this: runner fixture source/preflight controls what can start; Yard integration checks actual environments and upgrade retention. The matrix is supporting evidence.
Checked: actual unsafe cached image refused before startup; corrected image accepted; affected checks1.571s; fresh full make ci162.286s; real Yard integration255.414s; full controller433.124s; final mdBook build/local links passed. All14candidate pins and product runtime/dependencies are unchanged.
Not checked: published runner artifact provenance, Docker upgrade, offboarding/disaster restore, and the remaining suite gates.
Current status: all hosted CI, trusted CodeQL and authenticated security review cleared head 529e0aff95f65a82720d830f25f0e6da2a02975f.
You need to: review and merge when ready; merge remains the owner's decision.

Detail

The earlier Yard V4/publication commands passed their primary assertions, but later binary inspection found the cached runner embedded the unpatched Identity catalog and redeployed Identity. Those original results remain historical evidence; they did not prove relay isolation through the runner phase. No production registration has been observed, and no production service query was used to infer otherwise.

The new preflight checks exact patched embedded Identity Kubernetes/Compose and Post Compose templates using a stopped, networkless container. The actual old image failed the check; the rebuilt local fixture passed it. The constrained-host fixture was compiled under the same Go resource bounds and inserted into a never-started local container, avoiding an uncapped Docker build. The ordinary CI fixture builds the patched source copy.

Fresh actual integration checked both published primary image digests, selected session/encryption/instance/client/directory/setup hashes, the original administrator session, fresh native administrator SSO, everyday Identity denial and existing runner ownership/socket/refusal/recreation/revoke behavior. Identity's relay environment passed all five Deployment/pod checkpoints. The catalog requires an explicit no-backup acknowledgement for this transition; no required migration backup or disaster restore is claimed.

Root DOX records the fixture isolation contract. Documentation ownership, child indices, manual source and book configuration are unchanged. The whole suite remains incomplete. The report/matrix were the only files edited after real execution, followed by fresh documentation checks.

AI assistance: Codex (gpt-6.1-sol) implemented the fixture correction, inspected actual binary/source evidence and ran the named checks on Major. No delegation was used.

Install the published previous primary image and verify immutable image identity, retained key/config hashes, native administrator access and runner ownership around the CLI upgrade. Keep published-runner and broader lifecycle qualification explicit in the acceptance ledger.

AI-Assisted-By: Codex (gpt-6.1-sol)
@Yoshiofthewire

Yoshiofthewire commented Nov 18, 2026 •

Copy link
Copy Markdown
Member Author

PR Reviewer Guide 🔍

Here are some key observations to aid the review process:

⏱️ Estimated effort to review: 3 🔵🔵🔵⚪⚪

🧪 PR contains tests

⚡ Recommended focus areas for review

Stale Timestamp

coverage_audit.checked_at is 2026-11-18T04:03:49Z, but the same audit now records the corrected Yard case and the 9/10 upgrade count. That case's own results run from 05:17Z to 05:25Z, so the audit timestamp is earlier than the evidence it summarizes. This is a provenance error in a release-acceptance record and has no runtime impact. Update the timestamp to when the audit was actually re-evaluated.


Advisory only: this comment never gates the pull request.
claude-sonnet-5-5 using pr-agent on behalf of Yoshi

@Yoshiofthewire

Yoshiofthewire commented Nov 18, 2026 •

Copy link
Copy Markdown
Member Author

Security review - cleared

Detail withheld: this repository is public, and posting an unfixed finding here would be public disclosure. The full report was posted to the hand-off board at https://myslop.urlxl.us/f/pr-reviewer-busnes-app-kyquickstart-212, where it is readable by the operator and expires seven days after the last post.


gpt-6.1-sol using security-audit on behalf of Yoshi

@Yoshiofthewire

Yoshiofthewire commented Nov 18, 2026 •

Copy link
Copy Markdown
Member Author

Autonomous review - 1/1 personas cleared

  • security: cleared

Merging remains a human decision; this bot never approves.


gpt-6.1-sol using security-audit on behalf of Yoshi

@Yoshiofthewire
Yoshiofthewire marked this pull request as draft November 18, 2026 05:11
Embed relay overrides in fixture runner builds and reject unsafe cached images before workloads start. Verify deployed Identity environments through runner operations and record fresh published-primary upgrade evidence.

Co-authored-by: Codex <codex@openai.com>
@Yoshiofthewire Yoshiofthewire changed the title Qualify KyYard upgrades from published images Qualify KyYard upgrades with relay-isolated runner fixtures Nov 18, 2026
@Yoshiofthewire
Yoshiofthewire marked this pull request as ready for review November 18, 2026 05:27
@Yoshiofthewire
Yoshiofthewire merged commit 2ad8888 into master Nov 18, 2026
25 checks passed
@Yoshiofthewire
Yoshiofthewire deleted the test/yard-primary-acceptance branch November 18, 2026 12:55
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant