Summary

Follow-up for #107, stacked on #118 (issue-115-rendered-completeness). This corrects the writer/revision guidance behind the recorded stage citation failure.

  • Require stage evidence for the public development: an observed result for demonstrated, explicit status for announcement/preview/rollout, or a cited unresolved limit for uncertainty.
  • Preserve supported wording and exact citations while they still fit the repaired narrative. Permit legitimate scope changes; final independent review still checks every item.
  • Represent review-revision sources as a lossless table with field names listed once. All values, excerpts and original citation numbers remain available within the unchanged 18,000-character limit.
  • Add synthetic regressions for setup-only stage rejection, retaining supported demonstration evidence, and narrowing a previously supported stage.

Review policy, reviewer payloads, response schemas, parsing, model-call limits and production settings are unchanged.

Validation

  • Independent review of the actual diff and request-budget audit.
  • Full test suite: 637 passed, 87.38% coverage.
  • Ruff and git diff --check passed.
  • Exact captured four-response replay still rejects the unsupported final stage after four calls. This is an offline replay, not evidence of live writer compliance.
  • Lossless source reconstruction checked for one source, noncontiguous source numbers [3, 8], and all eight sources.
  • Six complete reviewer calibration requests match the previously successful calibration byte for byte.
Boundary fixture Characters / 18,000
Eight-source draft 17,970
Validation revision 17,875
Rejected eight-source skip revision 17,905

These are measured fixtures, not a guarantee that every maximal combination fits. The existing oversized-input rejection remains in place.

Live acceptance still pending

The earlier paid attempt allowance is exhausted. A finite extension has been prepared for owner review in the local evaluation packet. No paid calls were made during this preparation.

Mock tests and captured response replay establish orchestration behavior; live writer compliance still needs the complete no-send workflows and review of their exact public renders. This draft does not request merge or activation yet.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant