Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
6 changes: 6 additions & 0 deletions pokemon_sv/PR_PLAN.md
Original file line number Diff line number Diff line change
@@ -1,5 +1,11 @@
# BBQ work → upstream PRs: layered plan

**Status update (2026-11-06):** use [PR_PROGRESS.md](PR_PROGRESS.md) for the
complete current inventory and logging consolidation decisions. The dependency
graphs and readiness statements below are the original design snapshot; several
prerequisites have since merged or been replaced. Merge parents; old references
to rebasing are superseded by the agents-branch workflow.

Written 2026-10-26 from lab/r10 at f20d06c7b against upstream/main d47a41f82.
lab/r10 is 148 non-merge commits ahead (+9.5k / −0.9k in `SerialPrograms/Source`); about 100 of
those commits (+5.5k net) are in no fork PR yet. This plan says how all of it becomes reviewable
Expand Down
Loading
Loading