You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Stage E1 / CONV-05 / INT-12: emit known-good + known-bad fixture corpus into typed-wasm cross_compat (C5.1) #562
TYPED-WASM-ROADMAP.adoc:311-331; TECH-DEBT CONV-05 row. typed-wasm landed the harness side (cross_compat_real.rs + 4 real affinescript-emitted fixture pairs @ 21edc15, their PR #81) — affinescript docs still call this 'not yet shipped' (TYPED-WASM-INTERFACE.adoc:274-277, stale). Residual here: (1) known-BAD fixture corpus (verifier must reject), (2) regeneration workflow on the affinescript side, (3) refresh the stale doc rows. Coordination: hyperpolymath/typed-wasm#35 (L13 mirror + fixture corpus ask). This is the Stage-E exit-criterion bridge — mechanized agreement proofs live in typed-wasm, fed by these fixtures. Part of the v1-readiness ledger.
Activity