Roadmap item 3/10 · Workstream: Reliability · Risk: High · Approval required: Yes · Target milestone: M1 — Stabilise control plane
Objective
Restore the GitHub → n8n → DRC pipeline after the September 2026 execution-quota exhaustion, stop monitoring from consuming the quota the pipeline needs, and publish a blameless post-incident review.
Non-goals
- Rotating secrets or changing credentials
- Re-architecting away from n8n
- Tuning DRC prompts
Acceptance criteria
Dependencies
- Human decision on the n8n plan/quota
- Review of the canary branch
fix/intake-canary-invariants
Risk
High — production workflow changes; every n8n edit must be published and verified on a real execution.
Test evidence required
- Execution IDs showing success after remediation for each affected workflow
- 24 h execution count per workflow before vs after cadence changes
- Intake canary run showing the correct verdict
- Host-side alert fired in a forced test
Definition of done
Objective
Restore the GitHub → n8n → DRC pipeline after the September 2026 execution-quota exhaustion, stop monitoring from consuming the quota the pipeline needs, and publish a blameless post-incident review.
Non-goals
Acceptance criteria
fix/intake-canary-invariants): stale incidents reportstale_incident, neverhealthyDependencies
fix/intake-canary-invariantsRisk
High — production workflow changes; every n8n edit must be published and verified on a real execution.
Test evidence required
Definition of done
docs/(British English, no secrets)