Skip to content

OCPBUGS-100390: UPSTREAM: 21443: Revert "Reuse events between sync loops" - #394

Merged
openshift-merge-bot[bot] merged 1 commit into
openshift:openshift-4.21from
redhat-chai-bot:cherry-pick-memory-fix-4.21
Aug 3, 2026
Merged

OCPBUGS-100390: UPSTREAM: 21443: Revert "Reuse events between sync loops"#394
openshift-merge-bot[bot] merged 1 commit into
openshift:openshift-4.21from
redhat-chai-bot:cherry-pick-memory-fix-4.21

Conversation

@redhat-chai-bot

Copy link
Copy Markdown

Cherry-pick: etcd memory regression fix for 4.21

Cherry-pick of upstream etcd-io/etcd#21443 — Revert "Reuse events between sync loops"

Problem

etcd 3.6 introduced a memory regression that scales with cluster size (OCPBUGS-76329). The rangeEventsWithReuse optimization held event objects across sync loops, causing unbounded memory growth:

Cluster Size etcd 3.5 Max RSS etcd 3.6 Max RSS Max Change
24 nodes 468 MiB 541 MiB +15.6%
120 nodes 893 MiB 1.24 GiB +42.2%
250 nodes 1.13 GiB 2.96 GiB +162%

Fix

This cherry-picks the upstream revert which:

  • Removes the rangeEventsWithReuse function
  • Removes the shared evs variable from syncWatchersLoop
  • Restores the original rangeEvents and kvsToEvents signatures with contains filtering

Why cherry-pick instead of full rebase

OCP 4.21 etcd is on 3.6.5. A full rebase to 3.6.9+ is complicated by Go version constraints (see openshift/etcd#377 which is held). This targeted cherry-pick addresses the critical memory regression without introducing other changes.

Build and test verification

  • go build ./...
  • go test ./server/storage/mvcc/... ✅ (11.7s)

References


@sdodson requested in Slack thread

@coderabbitai

coderabbitai Bot commented Jul 30, 2026

Copy link
Copy Markdown

Important

Review skipped

Auto reviews are disabled on base/target branches other than the default branch.

Please check the settings in the CodeRabbit UI or the .coderabbit.yaml file in this repository. To trigger a single review, invoke the @coderabbitai review command.

⚙️ Run configuration

Configuration used: Repository: openshift/coderabbit/.coderabbit.yaml

Review profile: CHILL

Plan: Pro Plus

Run ID: 60313b36-dcad-4278-9091-502d80444ce1

You can disable this status message by setting the reviews.review_status to false in the CodeRabbit configuration file.

Use the checkbox below for a quick retry:

  • 🔍 Trigger review

Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

❤️ Share

Comment @coderabbitai help to get the list of available commands.

@openshift-ci
openshift-ci Bot requested review from hasbro17 and tjungblu July 30, 2026 23:19
@openshift-ci

openshift-ci Bot commented Jul 31, 2026

Copy link
Copy Markdown

@redhat-chai-bot: The following tests failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/prow/upstream-integration 0ff063b link false /test upstream-integration
ci/prow/upstream-e2e 0ff063b link false /test upstream-e2e

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@sdodson sdodson added lgtm Indicates that a PR is ready to be merged. approved Indicates a PR has been approved by an approver from all required OWNERS files. staff-eng-approved Indicates a release branch PR has been approved by a staff engineer (formerly group/pillar lead). backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. labels Jul 31, 2026
@openshift-ci

openshift-ci Bot commented Jul 31, 2026

Copy link
Copy Markdown

[APPROVALNOTIFIER] This PR is APPROVED

Approval requirements bypassed by manually added approval.

This pull-request has been approved by: redhat-chai-bot

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@sdodson

sdodson commented Jul 31, 2026

Copy link
Copy Markdown
Member

/jira cherry-pick OCPBUGS-76329

@openshift-ci-robot

Copy link
Copy Markdown

@sdodson: Jira Issue OCPBUGS-76329 has been cloned as Jira Issue OCPBUGS-100390. Will retitle bug to link to clone.
/retitle OCPBUGS-100390: UPSTREAM: 21443: Revert "Reuse events between sync loops"

Details

In response to this:

/jira cherry-pick OCPBUGS-76329

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci openshift-ci Bot changed the title UPSTREAM: 21443: Revert "Reuse events between sync loops" OCPBUGS-100390: UPSTREAM: 21443: Revert "Reuse events between sync loops" Jul 31, 2026
@openshift-ci-robot openshift-ci-robot added jira/severity-important Referenced Jira bug's severity is important for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. labels Jul 31, 2026
@openshift-ci-robot

Copy link
Copy Markdown

@redhat-chai-bot: This pull request references Jira Issue OCPBUGS-100390, which is invalid:

  • expected dependent Jira Issue OCPBUGS-76329 to be in one of the following states: VERIFIED, RELEASE PENDING, CLOSED (ERRATA), CLOSED (CURRENT RELEASE), CLOSED (DONE), CLOSED (DONE-ERRATA), but it is ON_QA instead

Comment /jira refresh to re-evaluate validity if changes to the Jira bug are made, or edit the title of this pull request to link to a different bug.

The bug has been updated to refer to the pull request using the external bug tracker.

Details

In response to this:

Cherry-pick: etcd memory regression fix for 4.21

Cherry-pick of upstream etcd-io/etcd#21443 — Revert "Reuse events between sync loops"

Problem

etcd 3.6 introduced a memory regression that scales with cluster size (OCPBUGS-76329). The rangeEventsWithReuse optimization held event objects across sync loops, causing unbounded memory growth:

Cluster Size etcd 3.5 Max RSS etcd 3.6 Max RSS Max Change
24 nodes 468 MiB 541 MiB +15.6%
120 nodes 893 MiB 1.24 GiB +42.2%
250 nodes 1.13 GiB 2.96 GiB +162%

Fix

This cherry-picks the upstream revert which:

  • Removes the rangeEventsWithReuse function
  • Removes the shared evs variable from syncWatchersLoop
  • Restores the original rangeEvents and kvsToEvents signatures with contains filtering

Why cherry-pick instead of full rebase

OCP 4.21 etcd is on 3.6.5. A full rebase to 3.6.9+ is complicated by Go version constraints (see openshift/etcd#377 which is held). This targeted cherry-pick addresses the critical memory regression without introducing other changes.

Build and test verification

  • go build ./...
  • go test ./server/storage/mvcc/... ✅ (11.7s)

References


@sdodson requested in Slack thread

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@sdodson

sdodson commented Aug 3, 2026

Copy link
Copy Markdown
Member

/jira refresh

@openshift-ci-robot openshift-ci-robot added jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. and removed jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. labels Aug 3, 2026
@openshift-ci-robot

Copy link
Copy Markdown

@sdodson: This pull request references Jira Issue OCPBUGS-100390, which is valid. The bug has been moved to the POST state.

7 validation(s) were run on this bug
  • bug is open, matching expected state (open)
  • bug target version (4.21.z) matches configured target version for branch (4.21.z)
  • bug is in the state New, which is one of the valid states (NEW, ASSIGNED, POST)
  • release note text is set and does not match the template
  • dependent bug Jira Issue OCPBUGS-76329 is in the state Verified, which is one of the valid states (VERIFIED, RELEASE PENDING, CLOSED (ERRATA), CLOSED (CURRENT RELEASE), CLOSED (DONE), CLOSED (DONE-ERRATA))
  • dependent Jira Issue OCPBUGS-76329 targets the "4.22.0" version, which is one of the valid target versions: 4.22.0
  • bug has dependents
Details

In response to this:

/jira refresh

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@sdodson

sdodson commented Aug 3, 2026

Copy link
Copy Markdown
Member

/verified by @mcornea on 4.22, assume the same holds true here

@openshift-ci-robot openshift-ci-robot added the verified Signifies that the PR passed pre-merge verification criteria label Aug 3, 2026
@openshift-ci-robot

Copy link
Copy Markdown

@sdodson: This PR has been marked as verified by @mcornea on 4.22,assume the same holds true here.

Details

In response to this:

/verified by @mcornea on 4.22, assume the same holds true here

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-merge-bot
openshift-merge-bot Bot merged commit b6dda54 into openshift:openshift-4.21 Aug 3, 2026
9 of 11 checks passed
@openshift-ci-robot

Copy link
Copy Markdown

@redhat-chai-bot: Jira Issue Verification Checks: Jira Issue OCPBUGS-100390
✔️ This pull request was pre-merge verified.
✔️ All associated pull requests have merged.
✔️ All associated, merged pull requests were pre-merge verified.

Jira Issue OCPBUGS-100390 has been moved to the MODIFIED state and will move to the VERIFIED state when the change is available in an accepted nightly payload. 🕓

Details

In response to this:

Cherry-pick: etcd memory regression fix for 4.21

Cherry-pick of upstream etcd-io/etcd#21443 — Revert "Reuse events between sync loops"

Problem

etcd 3.6 introduced a memory regression that scales with cluster size (OCPBUGS-76329). The rangeEventsWithReuse optimization held event objects across sync loops, causing unbounded memory growth:

Cluster Size etcd 3.5 Max RSS etcd 3.6 Max RSS Max Change
24 nodes 468 MiB 541 MiB +15.6%
120 nodes 893 MiB 1.24 GiB +42.2%
250 nodes 1.13 GiB 2.96 GiB +162%

Fix

This cherry-picks the upstream revert which:

  • Removes the rangeEventsWithReuse function
  • Removes the shared evs variable from syncWatchersLoop
  • Restores the original rangeEvents and kvsToEvents signatures with contains filtering

Why cherry-pick instead of full rebase

OCP 4.21 etcd is on 3.6.5. A full rebase to 3.6.9+ is complicated by Go version constraints (see openshift/etcd#377 which is held). This targeted cherry-pick addresses the critical memory regression without introducing other changes.

Build and test verification

  • go build ./...
  • go test ./server/storage/mvcc/... ✅ (11.7s)

References


@sdodson requested in Slack thread

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. jira/severity-important Referenced Jira bug's severity is important for the branch this PR is targeting. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. staff-eng-approved Indicates a release branch PR has been approved by a staff engineer (formerly group/pillar lead). verified Signifies that the PR passed pre-merge verification criteria

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants