chore(optimizer): bundle Energyplan 0.8.0 - #2052
Merged
Merged
Conversation
Energyplan 0.8.0 (51f0c201) plans at lower cost than 0.7.1 at the same goals on the gate corpora and 500 recorded home-box replans, with no plan that meets fewer goals and no budget overrun. It carries 0.7.1's fixes. Protocol v1 and site signs are unchanged; the time budget is the same. Only the two Linux workers, manifest.json and the third-party notices change. The health checks expect 0.8.0. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Signed-off-by: Fredrik Ahlgren <fredrik@sourceful-labs.com>
Codex Review Summary: ✅ CompletedThis comment shows the latest Codex review activity on this pull request.
ℹ️ About Codex in GitHubYour team has set up Codex to review pull requests in this repo. Reviews are triggered when you
Codex reacts with 👀 while any review is running, comments if it has suggestions, and reacts with 👍 once all reviews finish with no findings. |
miravoss26
reviewed
Nov 21, 2026
miravoss26
left a comment
Contributor
There was a problem hiding this comment.
Bundles Energyplan 0.8.0 over 0.7.1: two Linux worker binaries, manifest (version, source commit 51f0c201, sha256/bytes), the microlp modification note in THIRD-PARTY-NOTICES, a changeset, and the two test version assertions 0.7.1 to 0.8.0.
- Correctness: the manifest and notices edits are consistent with the PR description (worker hashes match the ones listed). I can't verify the binaries themselves from a diff, so they are only as good as the build behind them. Please confirm they come from energyplan@51f0c201.
- CI:
core (Go)andgo test + vetfail onTestLaterRunsAfterTheSlotIsFreeingo/internal/ocpp. That package isn't touched here and looks like a timing flake, but it needs a re-run to be sure. The mpc tests that assert 0.8.0 were not shown failing. - Security: no new deps, hosts or secrets. Opaque binaries are the one thing a reviewer can't read, hence the provenance ask above.
- Ordering: energyplan#86 (the release that produces 51f0c201) is still open, so the source commit isn't on that repo's main yet.
Needs a human decision on re-running CI and on merging after energyplan#86 lands.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Problem and result
Bundle Energyplan 0.8.0 (source commit 51f0c201, private pre-release tag
v0.8.0-beta.1). It plans at lower cost than the bundled 0.7.1 at the same goals, with the same protocol and the same time budget. It carries 0.7.1's fixes (#2037, #2047). Core still validates every plan.Scope and safety
manifest.jsonandTHIRD-PARTY-NOTICES.txt(the solver library's modification note) change. License, Rust runtime licenses and schemas are byte-identical.6d2e1e1e…9e66bd4b…energyplan_test.goandenergyplan_fault_test.goexpect 0.8.0.docs/energyplan-contract.mdare unchanged; the contract copy in Energyplan is byte-identical to master's.Verification
ValidatePlan, run on master) accepted every plan;python3 optimizer/native/verify.py --host-binarypassed;go test -count=5 ./internal/mpc ./internal/energyforecast ./cmd/ftw -run 'Native|RustForecastHost'passed;make native-solver-testandmake verifypassed.Checklist
🤖 Generated with Claude Code