Review daily QA backlog and follow unresolved work - #749
Conversation
|
Lead has adopted draft PR749 at 3bec9e6 / tree f778148e3e93fd4f72c12d67fdf1cde2151f8749, against 7dd2918. The same original independent source Reviewer has started the four-path review. The original Upstream owner and source task remain unchanged. Final affected edit 64/64 and the normal four-file push hook passed. The sole broad ready remains FAILED, 1378 passed / 3 failed. Saved evidence locates the typecheck case deadline and two post-restart fixture health waits; it does not establish their underlying cause. Final-head verification of those three files passed 3/3 with the same four workers and unchanged deadlines. These are separate observations; the original failed ready is not relabeled. Current-head CI 43361530045 is pending at this acknowledgement. Source review and the required check/failure disposition must be resolved before protected merge or runtime adoption. After acceptance, Lead owns updating the existing pinned hourly runtime at an inactive writer boundary, preserving its one-hour schedule, authentication route and durable state. The first new bounded backlog pass must lead to actual assigned work or evidence-backed dispositions. A prompt receipt or this PR's creation is not completion. No second scheduler, queue, actor or blanket issue closure is authorized. |
|
Lead has adopted corrected head 06be915, tree 55896f2d3373806099ec09bc8b2f030e9f93d30a, composed normally against main f2b361c. The same original Reviewer is reviewing only the correction and affected contracts. The single batch addresses QABACKLOG749-01 with bounded fair rereading and reminders for closed issues awaiting evidence, and QABACKLOG749-02 with native Process-Owner/Next/Blocker/Evidence handling. The affected existing scan also exposed a lost overdue QA instruction; that correction retains the instruction without duplicate notification. The first correction check remains FAILED 80/82; final stable affected checks passed 82/82 and the normal hook passed. Original ready FAILED 1378/1381 and the original focused 3/3 pass remain distinct; underlying deadline/health-wait causes are UNKNOWN. No second broad ready was run. Required current-head CI 43362986684 and delta source acceptance remain pending at this acknowledgement. Runtime adoption has not occurred. Lead owns protected merge, the existing hourly job's inactive-writer adoption, and the first actual bounded assignment or evidence-backed disposition. Notification delivery is not acknowledgement or completion; no new scheduler or automatic blanket closure is added. |
|
The original correction Reviewer accepted 06be915 and closed both review findings. Required exact-head CI 43362986684:1 passed. Normal protected merge produced d604853, tree 55896f2d3373806099ec09bc8b2f030e9f93d30a. No bypass or second broad ready was used; original failed ready and correction attempts retain their outcomes and UNKNOWN underlying causes. The existing hourly runtime now pins that accepted merged source. Adoption occurred while the sole existing job was inactive; the same plist, 3600-second interval, protected-file authentication route and durable state were preserved. Exact source adoption SHA256: 7c4c26d2c5c6e4c03a150431a2b908946ee9f5283740bee788ef21dc30ccfdd7. Its first normal pass completed with exit0. It inventoried 66 open issues, selected8 daily items plus6 unresolved follow-ups, and reused an existing full execution without starting a duplicate matrix. This is a persisted Asia/Shanghai daily pass and six-hour unresolved follow-up within the existing hourly job. The fourteen selected items now have actual original-issue dispositions. The existing Upstream and Backend developers took bounded saved-evidence assignments and returned concrete results. The same original QA Reviewer accepted the exact #541 consolidation and #733 natural Cloud execution evidence. Lead then applied scoped closure to those two records after fresh public controls. The 60 original QA states and #119 remain outside #541's closure; #733 retains its original failed ready and UNKNOWN cause while its exact integrated execution obligation is complete. Existing unresolved incidents retain their individual causes/gaps and owners. Process records now carry their native Process-Owner/Next/Blocker/Evidence fields. Old product requests were not automatically resumed. A newly renewed #553 cancellation was acknowledged on its original record: the current job explicitly exceeded 30 minutes. The original Upstream returned a bounded saved-log assessment; underlying cost or stall and the historical cancellation cause remain unresolved. No replay, deadline increase or unreviewed grouping was performed. Implementation, accepted runtime adoption and first bounded work are established. Review/verification and eventual closure of individual backlog issues remain separate; neither the sent prompt nor this PR's merge is treated as issue completion. No blanket issue closure or second scheduler was performed. |
Problem and change
The existing hourly QA queue permanently deduplicated a successful prompt, leaving the next Beijing daily backlog and unresolved work without a follow-up. This change uses that same queue invocation for one bounded daily open-issue inventory and a six-hour unresolved-work follow-up. Delivery, assignment, fixing, review/verification and evidenced closure remain distinct. Current owners, paused/product disposition boundaries, uncertain-send recovery and queue state carry forward.
Original reviewer correction
Process-Owner,Process-Next, blocker and evidence fields for ownership, progress and six-hour follow-up, without requiring QA triage labels or claiming completion. The synthetic case uses the actual process-scan writer body.Validation and limits
check:edit: 64/64 passed on3bec9e6d.check:ready: FAILED, 1,378 passed and 3 failed on stable earlier input.scripts/typecheck.test.tscrossed its 30-second case deadline;server/safety-floor.e2e.test.tsandserver/full-access-default.e2e.test.tsfailed post-restart health waits. Saved logs do not establish the restart cause. These failures remain FAILED.3bec9e6d: 3/3 passed with four workers and unchanged deadlines; it does not reclassify ready.06be91520d3b98e852206736befa0462cbf49d7c: 82/82 passed, stable input. Normal push hook passed with 15 changed paths checked.Current main
f2b361c8498b8bd364629903683d81be08c02039was merged without conflict. All four backlog blobs from the correction and all 11 accepted Activities blobs from main match their parents. Lead owns the inactive-writer transition of the existing hourly job and its first actual bounded backlog dispositions after protected merge.Base:
f2b361c8498b8bd364629903683d81be08c02039Head:
06be91520d3b98e852206736befa0462cbf49d7cQA-Handoff: 06be915