Repository navigation
Conversation
This was referenced Oct 22, 2026
Open
After an exhausted quest is rerolled, end the current batch and replan before continuing old queued work, so a replacement such as Travel 500m enters the next plan instead of waiting behind the old queue. Normal date and save handling still runs at the end of the shortened round. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01AKYzhrMnPK61XHWEch4a6E
dayfine
force-pushed
the
bbq/reuse-quest-board
branch
from
October 28, 2026 08:14
bbc2318 to
dcd1f2a
Compare
dayfine
force-pushed
the
bbq/replan-after-reroll
branch
from
October 28, 2026 08:14
e4c5cc4 to
09982bb
Compare
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01AKYzhrMnPK61XHWEch4a6E
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01AKYzhrMnPK61XHWEch4a6E
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01AKYzhrMnPK61XHWEch4a6E
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01AKYzhrMnPK61XHWEch4a6E
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01AKYzhrMnPK61XHWEch4a6E
Owner
Author
|
Superseded by consolidated Tree 1 PR #272. |
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Part of PokemonAutomation/ComputerControl#263.
After an exhausted quest is rerolled, end the current batch and replan before continuing old queued work. Preserve normal date/save handling. This lets a replacement such as Travel 500m enter the next plan instead of waiting behind the old Photo/TM queue; it preserves the existing planner's board order.
Verification: full arm64 build and 46 registered native C++ cases pass on
30e84abef. In the liveea047a930trial, failed Savanna Photo rerolled to Travel, which dispatched 45.72 seconds later ahead of old queued Make TM/Catch Any and completed in 92.23 seconds. Duration, BP and remaining limits are in the run result.Live acceptance used two separately recorded phases (8m06s and 35m53s); both feature paths triggered. Final balance 14,250 BP, +180 combined (240 earned − 60 reroll expense). Ended early after evidence review; a full one-hour stability trial was not completed.
🤖 Generated with Claude Code
https://claude.ai/code/session_01AKYzhrMnPK61XHWEch4a6E